day 25

Violin Plot

Violin Plot

This chart shows the relationship between function/parameter and iteration time. The thickness of the shaded region indicates the probability that a measurement of the given function/parameter would take a particular length of time.

day 25/part 1

PDF of Slope Iteration Times